We work with global engineering companies, top academic institutions and government bodies to create innovative solutions for retail and beyond.

Want to become a partner? Get in touch and sign up for our newsletter to keep in touch with the latest developments.

Working with the Cranfield Impact Centre on AGV safety

Product development team, Automation Engineering

Whenever we deploy a new product within our highly automated warehouses, we strive to be prepared for any eventuality. This means ensuring minimal damage if the worst case scenario should arise.

With thousands of Automated Guided Vehicles (AGVs) operating within our latest CFCs, safety related products must comply with the relevant safety standards including, but not limited to, crash proofing. We required a partner capable of providing expert knowledge to previously unseen technologies while being able to act as rapidly and flexibly as we do.

The Cranfield Impact Centre is the crash test facility of choice for numerous Formula One and automotive teams and one of the few nationwide with the capability and flexibility to meet our demands. Professor Jim Watson, an internationally renowned expert, has worked alongside our Product Development team to develop and carry out test plans for our safety products since before the first live tests began.

The Cranfield Impact Centre offered a high level of capability and flexibility when it came to testing the crash barriers of our AGV robots. They also offered invaluable on-site testing abilities, allowing us to ensure the safety of all elements of our autonomous warehouses in the worst case scenario.

The facility at our disposal includes:

  • a pneumatic sled impact area with high speed cameras
  • a vertical impact drop tower
  • a test bed for quasi-static loading
  • a centre of gravity and moment of inertia calculation rig

However, a key advantage of our collaboration has been the ability to install all required sensors in situ within our CFCs to test the bots under real life conditions, greatly reducing the number of approximations which must be made, thereby improving the reliability of our tests and the safety of our teams on site.

See more

Working with Siemens on the new pick stations

Product development team, Automation Engineering

Siemens believes we are on the threshold of the fourth industrial revolution and that automation is being followed by the digitalisation of production. The goal: an increase of productivity, efficiency, speed, and quality, resulting in higher competitiveness for companies on their way to the future of industry.

Our existing warehouses in Hatfield and Dordon now run on Siemens S7 platforms using PLCs and associated equipment to control over 20km of conveyor networks at each site.  We have also adopted a Siemens Safe PLC safety architecture.  Both elements, coupled with our Ocado Technology developed SCADA systems enable the precision control and rapid response required by our 24/7 centers.

For our new automated storage and retrieval system in Andover, we needed a pick station which allowed us to bring product into the machine using our proprietary robotic technology and enable us to buffer and accumulate the product in the station in a way that no ‘off the shelf’ pick station would allow us to do.

Consequently, we allied ourselves with Siemens to provide the level of customisation and verification in functionality and performance for our bespoke pick station and worked closely with them throughout the entire design process to ensure that we were able to deliver a solution according to the project’s objectives and the design brief for the station.

The collaboration with Siemens was a success and the pick station is now in operation in our site in Andover working with the wider system to reduce our times to pick an average order from 2 hours to around 5 minutes.

See more

Working with Bericote Properties and Gallagher on the Erith CFC4

Construction and Site Development team, Buildings Technology

The Buildings Technology team has recently been working in partnership with Bericote Properties and Gallagher to design and construct Erith CFC4, the world’s largest automated warehouse for grocery retail. The 563,000 sq ft facility, located on Bronze Age Way in Crossdox, has now been successfully completed and is due to go live in the near future. When operational, the Erith CFC will have the capacity to handle in excess of 200,000 orders per week.

The Erith CFC gives our business the ability to rapidly expand and offers our OSP customers in the UK additional capacity. This new facility will be our fourth grocery warehouse and the second based on the revolutionary OSP robot hive technology.

Read more about the construction of the Erith CFC here and here.

See more

Working with Ashe Construction on the head office move

Spoke Facilities Management team, Buildings Technology

When our previous head office was getting close to reaching full capacity, the wheels were set in motion to find and secure a new site. A potential location was identified at Trident Place, on the same business park as our previous head office, and we started planning the design.

The fit out project entailed the interior refurbishment of approximately 150,000sq ft of existing office space, over two adjacent buildings, which first needed to be stripped of all redundant features. We also began planning a decked carpark with a maximum capacity of 332 cars.

Following a successful tender period, Ashe Construction were appointed to construct the decked car park and undertake the refurbishment of the offices.

Construction of both projects started in July 2016, with practical completion of the office fit out taking place in December 2016 and completion of the car park taking place the following June.

We faced some initial challenges relating to ground conditions, but the Buildings Technology project management team worked alongside Ashe Construction to successfully reach a solution.

“The client’s project team assisted Ashe in getting up to speed with the project very quickly and a good working relationship was forged, based on honesty, collaboration and mutual respect. Decision making between the parties was clear and decisive, which led to two well completed projects.

Ashe found the client’s approach to project delivery incredibly refreshing and look forward to further opportunities of working with the client and their project team.” - Andrew Morris, Business Development Director, Ashe Construction

All head office employees are settled into the new offices and making use of the new and improved facilities on site.

See more